
6-Methoxy-1,2,3,4-tetrahydroisochinolinehydrochloride
Kwaliteit
ISO Gecertificeerd
Levering
24-48 uur
Technische Specificaties
57196-62-0
Others
Others
6-Methoxy-1,2,3,4-tetrahydroisoquinoline hydrochloride is a pharmaceutical intermediate utilized in the synthesis of various active compounds.
Cl.O(C1=CC=C2C(=C1)CCNC2)C
C10H14ClNO
199.68
Ice Packs
-20°C
Beschrijving
6-Methoxy-1,2,3,4-tetrahydroisochinolinehydrochloride Beschikbaar in 10 mg. Bestel eenvoudig online met snelle levering.
Specificaties
Recent bekeken producten

Prestained Protein Ladder (25-300 kDa)
CRG1114
250 µL

Rat IgG Lyophilized
B2013903
25 mg

Fluorescent Nanodiamond in DI water, < 1ppm NV
NDNV20nmMd10ml
10 mL

Fluorescent Nanodiamond in DI water, ~3ppm NV
NDNV70nmHi10ml
10 mL

Ligation Buffer
LB001
1.4 mL

BioCoupler® x 12
BC12
12 Each

Recombinant Common timothy PHLPIV/Phl p 4 Protein, N-His
YZZ03001
100 μg

NP (4-hydroxy-3-nitrophenylacetate)
NP-BSA-03Low – 10 mg
10 mg
Recent gezochte producten

Prestained Protein Ladder V
PL005S
each

Prestained Protein Ladder V
PL005
each

ProLite™ 5-245 kD Protein Ladder
18015-AAT
100 µL

Prestained Protein Ladder
B2014738
500 µL

Prestained protein ladder
PMK101
1 Package

Prestained protein ladder
PMK102
1 Package

Prestained protein ladder
PMK201
1 Package

Prestained protein ladder
PMK202
1 Package
